Kirkton weir fish pass update

Kirkton weir fish pass update

The precast units of the fish pass, that is being constructed at Kirkton weir, were put in place on Saturday.  After a pool was built at the downstream end of the pass and the section cut out of the weir, the units were placed on a level screed.

Today, the joins between the units were being sealed before they are bedded in with concrete.

Check out the last few days of work in less than 1 minute in the this time lapse video.